Once final construction plans are received and assessed the Construction Certificate can be issued for the project. The toilet block will close on 1 June 2019 in preparation for demolition on 18 June 2019. Part of the work on the hall will be new disabled access into the hall. The ramp pictured below will be replaced.

190520 Photo one 1

Image: Existing Ramp

190520 Photo Two 2

Image: Existing Toilet Block