  • Project typeCulvert Upgrade
  • Project value$965,175
  • Project scheduleProject to be completed by June 2027
  • Contractor nameToisch Pty Ltd
  • Completion Date01 July 2026
Completed Sandy Creek Rd Culvert.jpg

Project Overview

Sandy Creek Road is a rural road providing local access for residents, agricultural operations, and service vehicles. At the crossing over Sandy Creek, the existing infrastructure consists of a low-level causeway that becomes impassable during moderate to heavy rainfall, presenting both safety risks and network reliability concerns.

The purpose of this project is to replace the existing causeway with a reinforced concrete box culvert structure, improve road geometry, and construct associated drainage and pavement works.

The project is proudly funded by the NSW Government’s Local Government Recovery Grants - Natural Disaster Program AGRN1034 and delivered by Council.

Project Updates

August 2026

Works on the Sandy Creek Road box culvert project is now complete.

The newly constructed box culvert was reopened to live traffic on 1 July 2026, restoring access along Sandy Creek Road following the successful completion of construction works.

The project involved removing the existing flood-damaged causeway and constructing a new box culvert incorporating a fish passage to improve environmental outcomes and waterway connectivity.

Construction was completed over a four-month period by Toisch Pty Ltd with the total project cost being $532,441.

Location

Sandy Creek Road, Dunedoo 2844  View Map