Three concrete causeways along Ropers Road have been constructed. Council crews successfully constructed three causeways of various sizes.  The first one is 18m x 5.8m; the second one measured 18m x 6.1m and the last one was larger being 20m x 6.5m. Works took place between 14 August 2023 and 27 September 2023.

Works have commenced on a causeway along Newbank Lane outside Baradine, measuring 22m x 6.1m. 

 
Photo 1 - Ropers Road Causeway - October